top of page

Cerca


0091P24 BURNERS ASSEMBLY LINE D90-180 P80-MF650
This urgently completed project concerns an assembly line for burners of various and small sizes. The line is compact, modular and...

Davide Bretta
9 nov 2024Tempo di lettura: 1 min
33 visualizzazioni
0 commenti


0119A23 MOTORIZED CONVEYOR FOR TRANSPORT OF CRANE EXTENSIONS
This project was born from the Customer's need to transport different types of metal shapes from one workstation to another, in a...

Davide Bretta
13 apr 2024Tempo di lettura: 1 min
28 visualizzazioni
0 commenti


0075S24 PRE-ASSEMBLY AREA SIMPLIFIED LAYOUT
This is a layout that was necessary to study the relocation of an pre-assembly area. Particular attention to the work areas and...

Davide Bretta
30 mar 2024Tempo di lettura: 1 min
106 visualizzazioni
0 commenti


0067P23 MOBILE SUSPENSION SYSTEM WITH OVERHEAD CRANE FOR PAINTING PLANT
The design of these structures was necessary for a new complete painting plant The new layout is composed of various suspension systems...

Davide Bretta
3 gen 2024Tempo di lettura: 1 min
35 visualizzazioni
0 commenti


0043P22 ASSEMBLY LINE SIMPLIFIED LAYOUT
A layout that was necessary to study the relocation of an assembly line to a new location. Particular attention to the work areas and...

Davide Bretta
8 apr 2023Tempo di lettura: 1 min
23 visualizzazioni
0 commenti
bottom of page